Thumbnails

Slideshow (26 photos)

The Hut, Site Work (map)
 

Adam trims the "Adirondack Palm Tree"

 

Adam saws off his lanyard (not)

 

Large bucket on the excavator

 

Forms for the footer

 

South side of the foundation -- forms for the footer

 

Excavation crew dumping sand, then moving it into the foundation

 

Sheehan's excavator with its enormous bucket

 

Back filling the foundation with sand

 

Back filling the foundation with sand

 

Foundation as seen from the front of the hut as the excavation crew pack sand into the interior

 

View of the foundation from the west. The large concrete box in the center is the foundation for the chimney; the smaller free-standing piers are for posts in the timber frame.

 

Jim digs the trench for the phone cable on a hot, sweaty day

 

Jim measures the Hut site

 

Jim chips branches cleared from the view

 

John consults with the representative from the power company

 

The new driveway; the box on the right is the transformer

 

The excavation crew packs the sand with a tamping machine

 

A man from the power company repairs the transformer

 

The building site for the Hut before any work

 

Crane at the site before the raising

 

Looking south from the virgin site; stakes and ropes mark the locations of the building

 

The site layout occurred when the site was still snow covered; a sled was used to transport equipment to the site

 

The beginning of work on the concrete footers

 

Overview of the hole before the foundation

 

Another overview of the hole before the foundation

 

The view from the bay window