Adam trims the "Adirondack Palm Tree"
|
|
 |
Adam saws off his lanyard (not)
|
|
 |
Large bucket on the excavator
|
|
 |
Forms for the footer
|
|
 |
South side of the foundation -- forms for the footer
|
|
 |
Excavation crew dumping sand, then moving it into the foundation
|
|
 |
Sheehan's excavator with its enormous bucket
|
|
 |
Back filling the foundation with sand
|
|
 |
Back filling the foundation with sand
|
|
 |
Foundation as seen from the front of the hut as the excavation crew pack sand into the interior
|
|
 |
View of the foundation from the west. The large concrete box in the center is the foundation for the chimney; the smaller free-standing piers are for posts in the timber frame.
|
|
 |
Jim digs the trench for the phone cable on a hot, sweaty day
|
|
 |
Jim measures the Hut site
|
|
 |
Jim chips branches cleared from the view
|
|
 |
John consults with the representative from the power company
|
|
 |
The new driveway; the box on the right is the transformer
|
|
 |
The excavation crew packs the sand with a tamping machine
|
|
 |
A man from the power company repairs the transformer
|
|
 |
The building site for the Hut before any work
|
|
 |
Crane at the site before the raising
|
|
 |
Looking south from the virgin site; stakes and ropes mark the locations of the building
|
|
 |
The site layout occurred when the site was still snow covered; a sled was used to transport equipment to the site
|
|
 |
The beginning of work on the concrete footers
|
|
 |
Overview of the hole before the foundation
|
|
 |
Another overview of the hole before the foundation
|
|
 |
The view from the bay window
|